Scheduling deteriorating jobs with past-sequence-dependent delivery times

Ming Liu, Shijin Wang and Chengbin Chu

International Journal of Production Economics, 2013, vol. 144, issue 2, 418-421

Abstract: In this note, we study parallel machine scheduling problem with past-sequence-dependent delivery times and a deterioration effect. We present polynomial algorithms for the problem with the total workload, the total completion time, the total absolute differences in completion times objectives.

Keywords: Scheduling; Past-sequence-dependent delivery times; Deteriorating jobs (search for similar items in EconPapers)
Date: 2013
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527313001254
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:144:y:2013:i:2:p:418-421

DOI: 10.1016/j.ijpe.2013.03.009

Access Statistics for this article

International Journal of Production Economics is currently edited by Stefan Minner

More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:proeco:v:144:y:2013:i:2:p:418-421