Scheduling deteriorating jobs with past-sequence-dependent delivery times
Ming Liu,
Shijin Wang and
Chengbin Chu
International Journal of Production Economics, 2013, vol. 144, issue 2, 418-421
Abstract:
In this note, we study parallel machine scheduling problem with past-sequence-dependent delivery times and a deterioration effect. We present polynomial algorithms for the problem with the total workload, the total completion time, the total absolute differences in completion times objectives.
Keywords: Scheduling; Past-sequence-dependent delivery times; Deteriorating jobs (search for similar items in EconPapers)
Date: 2013
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527313001254
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:144:y:2013:i:2:p:418-421
DOI: 10.1016/j.ijpe.2013.03.009
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().