A note on scheduling a maintenance activity and due-window assignment based on common flow allowance
Ke Chen,
Min Ji and
Jiaojiao Ge
International Journal of Production Economics, 2013, vol. 145, issue 2, 645-646
Abstract:
In a recent paper [Mor, B., Mosheiov, G., 2012. Scheduling a maintenance activity and due-window assignment based on common flow allowance. International Journal of Production Economics 135, 222–230], a scheduling problem with job-dependent due-window based on common flow allowance is studied where the scheduler has the option to perform a maintenance activity to improve the processing times of the following jobs. However, as shown in this note, there exists an error in the paper. We will show the error by a counter-example, and correct it in this note.
Keywords: Scheduling; Due-window assignment; Flow allowance; Maintenance activity (search for similar items in EconPapers)
Date: 2013
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527313002454
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:145:y:2013:i:2:p:645-646
DOI: 10.1016/j.ijpe.2013.05.018
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().