EconPapers    
Economics at your fingertips  
 

A note on scheduling a maintenance activity and due-window assignment based on common flow allowance

Ke Chen, Min Ji and Jiaojiao Ge

International Journal of Production Economics, 2013, vol. 145, issue 2, 645-646

Abstract: In a recent paper [Mor, B., Mosheiov, G., 2012. Scheduling a maintenance activity and due-window assignment based on common flow allowance. International Journal of Production Economics 135, 222–230], a scheduling problem with job-dependent due-window based on common flow allowance is studied where the scheduler has the option to perform a maintenance activity to improve the processing times of the following jobs. However, as shown in this note, there exists an error in the paper. We will show the error by a counter-example, and correct it in this note.

Keywords: Scheduling; Due-window assignment; Flow allowance; Maintenance activity (search for similar items in EconPapers)
Date: 2013
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527313002454
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:145:y:2013:i:2:p:645-646

DOI: 10.1016/j.ijpe.2013.05.018

Access Statistics for this article

International Journal of Production Economics is currently edited by Stefan Minner

More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:proeco:v:145:y:2013:i:2:p:645-646