EconPapers    
Economics at your fingertips  
 

A production–repair inventory model with time-varying demand and multiple setups

Mohd Omar and Ivan Yeo

International Journal of Production Economics, 2014, vol. 155, issue C, 398-405

Abstract: In this paper, we proposed a model for an inventory system that satisfies a continuous time-varying demand for a finished product over a known and finite planning horizon by supplying both new and repaired items. New items are fabricated from a single type of raw material procured from external suppliers, while used items are collected from the customers and then repaired to a condition that is as-good-as-new. During each time interval, new items and used items are produced from multiple production and repair runs. The problem is to determine a joint policy for raw materials procurement, new items fabrication, and used items repair such that the total relevant cost of the model is minimized. We also proposed a numerical solution procedure and we tested the model with some numerical examples and a simple sensitivity analysis.

Keywords: Inventory; Production; Time-varying demand; Reuse (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527314000024
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:155:y:2014:i:c:p:398-405

DOI: 10.1016/j.ijpe.2013.12.034

Access Statistics for this article

International Journal of Production Economics is currently edited by Stefan Minner

More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:proeco:v:155:y:2014:i:c:p:398-405