Some new problems on two-agent scheduling to minimize the earliness costs
Shuenn-Ren Cheng
International Journal of Production Economics, 2014, vol. 156, issue C, 24-30
Abstract:
We consider several two-agent scheduling problems, where agents A and B have to share a single machine while processing their jobs. The objective is to minimize a certain objective function which depends on the completion time of all the jobs, while keeping the objective of agent B (with regard to its jobs only) below or at a fixed level Q. Specifically, we focus on minimizing certain objective functions of all the jobs such as maximum earliness cost, total weighted earliness cost, and total weighted earliness and tardiness cost, subject to an upper bound on a certain objective function of agent B. We introduce polynomial time solution for the maximum earliness cost problem, and prove NP-hardness for the total weighted earliness cost and total weighted earliness and tardiness cost cases. We also discuss some polynomially solvable cases for the total weighted earliness cost problem.
Keywords: Single-machine; Two-agent; Maximum earliness cost; Total weighted earliness cost (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527314001601
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:156:y:2014:i:c:p:24-30
DOI: 10.1016/j.ijpe.2014.05.004
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().