A note on “Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan”
Hatem Hadda
International Journal of Production Economics, 2015, vol. 159, issue C, 221-222
Abstract:
In Allaoui H., Lamouri S., Artiba A., Aghezzaf E., Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan. International Journal of Production Economics 2008, 112, 161–167, several results are proposed. We show in this note that some of them are false. We also extend the analysis for some other results.
Keywords: Scheduling; Flow shop; Preventive maintenance; Availability constraint; Makespan (search for similar items in EconPapers)
Date: 2015
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527314003004
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:159:y:2015:i:c:p:221-222
DOI: 10.1016/j.ijpe.2014.09.022
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().