Study on due-window assignment scheduling based on common flow allowance
Yu-Bin Wu,
Long Wan and
Xiao-Yuan Wang
International Journal of Production Economics, 2015, vol. 165, issue C, 155-157
Abstract:
The aim of this note is to show by a counter-example that some results in recent papers (Mosheiov and Oron, 2010; Mor and Mosheiov, 2012) are merely calculation mistakes. Correct results of these two papers are also provided.
Keywords: Scheduling; Due-window assignment; Maintenance activity; Common flow allowance (search for similar items in EconPapers)
Date: 2015
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527315001206
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:165:y:2015:i:c:p:155-157
DOI: 10.1016/j.ijpe.2015.04.005
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().