Energy-aware flexible job shop scheduling under time-of-use pricing
Myoung-Ju Park and
Andy Ham
International Journal of Production Economics, 2022, vol. 248, issue C
Abstract:
Compromising productivity in exchange for energy-saving does not appeal to capital-intensive manufacturing industries. However, we might be able to maintain the same productivity while significantly reducing the energy-cost. This paper addresses a flexible job shop scheduling under time-of-use pricing and scheduled downtime aiming to minimize makespan and total energy cost. First, an integer linear programming model is proposed. Second, a constraint programming model is proposed. Third, a managerial insight is derived. The computational study demonstrates we can maintain the maximum productivity while significantly reducing the energy-cost by 6.9% on average in large-sized benchmark instances.
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527322001001
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:248:y:2022:i:c:s0925527322001001
DOI: 10.1016/j.ijpe.2022.108507
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().