Joint optimization of flexible job shop scheduling and preventive maintenance under high-frequency production switching
Yu Wang,
Tangbin Xia,
Yuhui Xu,
Yutong Ding,
Meimei Zheng,
Ershun Pan and
Lifeng Xi
International Journal of Production Economics, 2024, vol. 269, issue C
Abstract:
To secure a larger market share in the dynamically evolving personalized market demand, enterprises have to adopt a more flexible production mode. In this context, the implementation of parallel production with multiple product types necessitates frequent switching between different products, imposing elevated requirements on machine fault-free operation and stable production. There is a compelling motivation to investigate the joint optimization of the flexible job shop scheduling problem and preventive maintenance (FJSSP-PM). However, existing research has primarily focused on utilizing predetermined maintenance as inputs for optimizing production scheduling, while overlooking the uncertain maintenance requirements of machines during the production process. Therefore, this paper proposes a two-stage joint optimization model to simultaneously address three subproblems: machine assignment, operation sequencing, and maintenance arrangement. Specifically, the first stage involves constructing a mathematical model for the FJSSP to minimize penalties for tardiness and workload balancing. Subsequently, a comprehensive failure rate model is developed to determine maintenance requirements for machines with production-dependent failure behavior, particularly under high-frequency production switching scenarios. Furthermore, a feedback-updated strategy is proposed to achieve synchronous optimization of production and maintenance activities in an economically and operationally efficient manner. Given the complexity of the problem, a hybrid meta-heuristic algorithm is designed to effectively handle large-scale cases. The effectiveness of the proposed model in terms of cost-savings has been verified compared with existing relevant methods.
Keywords: Flexible job shop scheduling; Preventive maintenance; High-frequency production switching; Variable operating conditions; Hybrid meta-heuristics algorithm (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0925527324000203
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:proeco:v:269:y:2024:i:c:s0925527324000203
DOI: 10.1016/j.ijpe.2024.109163
Access Statistics for this article
International Journal of Production Economics is currently edited by Stefan Minner
More articles in International Journal of Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().