Life-cycle analysis for design of the Sydney Olympic Stadium
Andrew Myer and
Chet Chaffee
Renewable Energy, 1997, vol. 10, issue 2, 169-172
Abstract:
For the first time, design of a major new public building in Australia has been subjected to Life-Cycle Assessment - with the aim of minimising overall environmental impact of the development. Resource depletion, emissions, and waste products were quantified from construction, use and demolition of three alternative design options: a ‘Base Case’, with little environmental innovation; the ‘Offer’, including existing, available reduced-impact technologies; and an ‘Enhanced Environmental Case’, including ‘cutting-edge’ technologies, which are expected to become available within the development programme. Results showed significant reductions in energy and water consumption, greenhouse gas emissions, and air and water pollution, for both the ‘Offer’ and ‘Enhanced’ cases. Greenhouse gas emissions from construction of the Stadium were also shown to be of the same order of magnitude as those from its operation.
Keywords: Life-cycle assessment; Boustead Model; environmental impact; construction materials; embodied energy; Eco-Profiles (search for similar items in EconPapers)
Date: 1997
References: Add references at CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0960148196000584
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:renene:v:10:y:1997:i:2:p:169-172
DOI: 10.1016/0960-1481(96)00058-4
Access Statistics for this article
Renewable Energy is currently edited by Soteris A. Kalogirou and Paul Christodoulides
More articles in Renewable Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().