Institutional uncertainty and its effect on electricity supply choices for fringe of grid consumers
D.p Remmer and
J Kaye
Renewable Energy, 2001, vol. 22, issue 1, 361-368
Abstract:
This paper explores institutional issues and, using a planning methodology able to incorporate risk and uncertainty, explores the affect of these issues on the determination of least cost planning solutions. Energy supply options for remote and fringe of grid consumers in New South Wales (NSW), Australia include grid connection, where the cost of connection is paid by the consumer and Remote Area Power Supply (RAPS) systems which may be bought or leased from a RAPS supplier. The methodology exposes these candidate supply options to a large set of scenarios which incorporate the decision maker’s view of the future in respect of institutional, demand and technological uncertainty. The resulting distribution of economic and performance outcomes can aid the decision maker to take risk sensitive decisions. Case study examples incorporating effects of institutional uncertainty suggest that RAPS systems are adaptable and risk-adverse energy supply options.
Date: 2001
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0960148100000550
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:renene:v:22:y:2001:i:1:p:361-368
DOI: 10.1016/S0960-1481(00)00055-0
Access Statistics for this article
Renewable Energy is currently edited by Soteris A. Kalogirou and Paul Christodoulides
More articles in Renewable Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().