Effect of test parameters on the recovery of underground after a Thermal Response Test and optimum waiting time between tests
Murat Aydin and
Ahmet Gultekin
Renewable Energy, 2025, vol. 239, issue C
Abstract:
Thermal Response Test (TRT) is an important method to determine the thermal properties of underground. These tests can be interrupted by unexpected reasons and a new test must be started in the same borehole, or the test must be repeated because of various reasons. In this paper, optimum waiting duration for a second test after a completed TRT is investigated through analyzing thermal behavior of a borehole during and after the test. A computational model is built, and it is verified with an experimental test. After the verification, the numerical model is used further parametric investigations. Different cases are considered and the results are discussed. The effect of thermal conductivity and test duration on the minimum waiting times are also investigated. It is shown that optimum waiting duration depends highly on the test conditions, however it varies between 10 and 23 days.
Keywords: Thermal response test; Borehole heat exchanger; Ground source heat pumps; Optimum duration between tests (search for similar items in EconPapers)
Date: 2025
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S096014812402158X
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:renene:v:239:y:2025:i:c:s096014812402158x
DOI: 10.1016/j.renene.2024.122090
Access Statistics for this article
Renewable Energy is currently edited by Soteris A. Kalogirou and Paul Christodoulides
More articles in Renewable Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().