EconPapers    
Economics at your fingertips  
 

Simulation and evaluation of a large-scale electrolysis plant - A case study in Pecem a Brazilian Port

Francisco Edvan B. Feitosa and Antonella L. Costa

Renewable Energy, 2025, vol. 250, issue C

Abstract: This work evaluates the potential for green hydrogen production near the Port of Pecém, located in the metropolitan region of Fortaleza, capital of the state of Ceará, in northeastern Brazil. There, the average annual solar irradiation is 5.84 kWh/m2/day, and the average wind speed is 6.87 m/s. Therefore, it is possible to produce a lot of hydrogen at a low and competitive cost. In this context, this work simulates and evaluates an off-grid hydrogen plant powered by photovoltaic, wind and hybrid energy, concluding that it is possible to produce up to 5.18 GW/year/MW at a levelized cost of 23.40 US$/MWh, 88.8 tons/year/MW of hydrogen at costs of 2.0–4.0 US$/kg. This production cost corroborates those assessed by the International Energy Agency.

Keywords: Electrolysis; Green hydrogen; Photovoltaic; Wind; Hydrogen plant; Numerical model homer pro; Energy simulations (search for similar items in EconPapers)
Date: 2025
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0960148125009097
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:renene:v:250:y:2025:i:c:s0960148125009097

DOI: 10.1016/j.renene.2025.123247

Access Statistics for this article

Renewable Energy is currently edited by Soteris A. Kalogirou and Paul Christodoulides

More articles in Renewable Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-07-01
Handle: RePEc:eee:renene:v:250:y:2025:i:c:s0960148125009097