Inconsistencies between China's wind power development and grid planning: An institutional perspective
Guo-liang Luo,
Fei Zhi and
Xinying Zhang
Renewable Energy, 2012, vol. 48, issue C, 52-56
Abstract:
Prior to 2002, the original State Power Corporation of China, integrating power plants and grids, focused more on power generation planning, causing the construction of grids lagging behind the development of power generation. After the split of plants and grids, power plants and grid companies become independent subjects of interest. So, multiple subjects of interests such as local governments, grids, electric power companies of provinces (autonomous regions) and wind power plants participate in the competition for their own benefits. In addition to the absence of governmental management in the wind power development and grid planning, the lack of a coordination mechanism between the Central Government and local governments and between the competent government departments results in the inconsistency between the wind power development and the grid planning and construction.
Keywords: Wind power development; Grid planning; Electric power system (search for similar items in EconPapers)
Date: 2012
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (18)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0960148112002637
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:renene:v:48:y:2012:i:c:p:52-56
DOI: 10.1016/j.renene.2012.04.022
Access Statistics for this article
Renewable Energy is currently edited by Soteris A. Kalogirou and Paul Christodoulides
More articles in Renewable Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().