EconPapers    
Economics at your fingertips  
 

The development and operation of the 9.0 MW taff ely wind farm in south wales

I.D. Parker

Renewable Energy, 1994, vol. 5, issue 1, 668-674

Abstract: The Taff Ely wind farm represents one of the first projects to be established in the UK on a commercial basis. The paper outlines the development issues and indicates the operational factors that are relevant to the site.

Keywords: Wind; renewable; energy (search for similar items in EconPapers)
Date: 1994
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0960148194904529
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:renene:v:5:y:1994:i:1:p:668-674

DOI: 10.1016/0960-1481(94)90452-9

Access Statistics for this article

Renewable Energy is currently edited by Soteris A. Kalogirou and Paul Christodoulides

More articles in Renewable Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:renene:v:5:y:1994:i:1:p:668-674