Blind Test 2 calculations for two in-line model wind turbines where the downstream turbine operates at various rotational speeds
Fabio Pierella,
Per-Åge Krogstad and
Lars Sætran
Renewable Energy, 2014, vol. 70, issue C, 62-77
Abstract:
In this paper we report on the results of the Blind Test 2 workshop, organized by Norcowe and Nowitech in Trondheim, Norway in October 2012. This workshop was arranged in order to find out how well wind turbine simulation models perform when applied to two turbines operating in line. Modelers with a suitable code were given boundary conditions of a wind tunnel test performed in the large wind tunnel facility at the Department of Energy and Process Engineering, at NTNU Trondheim, where two almost identical model turbines with a diameter of about 0.9∼m had been tested under various operating conditions. A detailed geometry specification of the models could be downloaded and the modelers were invited to submit the calculation without knowing the experimental results in advance.
Keywords: Wind turbine modeling; Experiment; Simulation comparison; Blind Test 2 (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (23)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0960148114001815
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:renene:v:70:y:2014:i:c:p:62-77
DOI: 10.1016/j.renene.2014.03.034
Access Statistics for this article
Renewable Energy is currently edited by Soteris A. Kalogirou and Paul Christodoulides
More articles in Renewable Energy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().