A new approach for material ordering and multi-mode resource constraint project scheduling problem in a multi-site context under interval-valued fuzzy uncertainty

Amirhosein Patoghi and Seyed Meysam Mousavi

Technological Forecasting and Social Change, 2021, vol. 173, issue C

Abstract: Taking both material procurement and project scheduling problem simultaneously has been proved the most noteworthy areas in project management. The ordering amount is a key factor due to the fact that through keeping a full stock of required materials, the probability of material shortage and corresponding inefficiency decline but the costs of inventory holding increase significantly. Besides, the delay in individual activities and consequently in project completion increase if a small amount of needed material is purchased. The multi-site context as one of the new resource constraint project scheduling problem (RCPSP) extensions has been widely utilized in some applications in real-world cases, especially in construction projects. In this paper, a new mathematical model is proposed for the combination of ordering problems considering all-unit discount policy and multi-mode RCPSP (MRCPSP) in the multi-site context. The developed model aims to minimize the project total cost as well as the completion time of the project. In the novel proposed mathematical model, the transportation time is crucial and depends on the site that activities are assigned. With respect to the inherent uncertainties in project management, the duration of activities, transportation time between sites, and lead time are regarded as triangular interval-valued fuzzy numbers. In addition, a new hybrid multi-objective uncertainty approach is presented to handle interval-valued fuzzy mathematical model. The results obtained by solving the presented model employing an application example from MPSPLIB data set and a real case study about seawater intake systems are appraised considering key parameters to validate the proposed model and provide some managerial insights.

Keywords: Project scheduling; Procurement; Multi-site context; Transfer time; Discount policy; Interval-valued fuzzy numbers (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0040162521005709
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:tefoso:v:173:y:2021:i:c:s0040162521005709

DOI: 10.1016/j.techfore.2021.121137

Access Statistics for this article

Technological Forecasting and Social Change is currently edited by Fred Phillips

More articles in Technological Forecasting and Social Change from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:tefoso:v:173:y:2021:i:c:s0040162521005709