Optimum zone structure during peak periods for existing urban rail lines
N. S. A. Ghoneim and
S. C. Wirasinghe
Transportation Research Part B: Methodological, 1986, vol. 20, issue 1, 7-18
Abstract:
The problem of optimizing the service along an existing two-track rail line by adopting a zone-stop schedule during the peak periods is investigated. A dynamic programming technique is employed to determine the number of zones, the stations that belong to each zone, the headway between trains to the same zone and the fleet size. The general objective of the analysis is to minimize the total transportation cost, defined as the sum of the costs of time to the passengers and the relevant rail capital and operating costs. The optimization problem is subject to several constraints including avoidance of train conflicts, limitations on the value of the headway and an available fleet size. The applicability of the model is demonstrated through a numerical example using field data.
Date: 1986
References: Add references at CitEc
Citations: View citations in EconPapers (10)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0191-2615(86)90032-9
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:transb:v:20:y:1986:i:1:p:7-18
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01
Access Statistics for this article
Transportation Research Part B: Methodological is currently edited by Fred Mannering
More articles in Transportation Research Part B: Methodological from Elsevier
Bibliographic data for series maintained by Catherine Liu ().