On the reserve capacities of priority junctions and roundabouts
S. C. Wong
Transportation Research Part B: Methodological, 1996, vol. 30, issue 6, 441-453
Abstract:
The concept of reverse capacity of a whole junction has been used extensively in the design of signal-controlled junctions. This concept, however, has not been applied to priority junctions and roundabouts, probably because of the complicated demand and supply relationship. When the demands on the approaches to the junction increase, the capacities of those non-priority approaches reduce at different rates. This makes the calculation of reserve capacity of the whole junction not a straightforward task. Using the definition of reserve capacity of a whole junction in Allsop (1972; Transpn Res. 6, 245-255), explicit formulae for the estimation of reserve capacities of priority junctions and roundabouts are derived in this paper. Numerical examples are given to illustrate the usefulness of these formulae.
Date: 1996
References: View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0191-2615(96)00008-2
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:transb:v:30:y:1996:i:6:p:441-453
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01
Access Statistics for this article
Transportation Research Part B: Methodological is currently edited by Fred Mannering
More articles in Transportation Research Part B: Methodological from Elsevier
Bibliographic data for series maintained by Catherine Liu ().