Work Continuity Optimization for the Westerscheldetunnel Project in the Netherlands
Mario Vanhoucke
Review of Business and Economic Literature, 2007, vol. LII, issue 3, 435-450
Abstract:
The scheduling of projects has gained increasing attention since the introduction of PERT and CPM. Both the scheduling literature and the software scheduling packages rely on (meta-)heuristic and exact procedures to schedule projects under various assumptions. However, there is still room for improvement by incorporating specific characteristics into the scheduling procedures. In this paper we describe the scheduling of a real-life project that aims at the construction of a tunnel at the Westerschelde in the Netherlands. In doing so, we show that so-called work continuity is the main issue during the scheduling phase. No software package, however, is able to incorporate this requirement in an exact way. We compare different possible schedules under various assumptions and prove the necessity of this new feature.
Date: 2007
References: Add references at CitEc
Citations:
Downloads: (external link)
http://feb.kuleuven.be/rebel/jaargangen/2001-2010/ ... 7-3-07_Vanhoucke.pdf
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ete:revbec:20070306
Access Statistics for this article
More articles in Review of Business and Economic Literature from KU Leuven, Faculty of Economics and Business (FEB), Review of Business and Economic Literature Contact information at EDIRC.
Bibliographic data for series maintained by library EBIB ().