Details about Mario Vanhoucke
Access statistics for papers by Mario Vanhoucke.
Last updated 2023-03-12. Update your information in the RePEc Author Service.
Short-id: pva66
Jump to Journal Articles Books Chapters
Working Papers
2011
- A hybrid electromagnetism-like/tabu search procedure for the single machine scheduling problem with a maximum lateness objective
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- An Artificial Immune System Algorithm for the Resource Availability Cost Problem
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (1)
- An Artificial Immune System based approach for solving the Nurse Re-rostering Problem
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- An Experimental Investigation of Metaheuristics for the Multi-Mode Resource-Constrained Project Scheduling Problem on New Dataset Instances
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration 
See also Journal Article An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances, European Journal of Operational Research, Elsevier (2014) View citations (31) (2014)
- An Invasive Weed Optimization Algorithm for the Resource Availability Cost Problem
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- Days on and days off scheduling of pilots under a variable workload
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- On the design of custom packs: Grouping of medical disposable items for surgical procedures
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- Solution representation, diversity and space reduction: A computational experiment with meta-heuristics
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- Truncated branch-and-bound guided meta-heuristics for the unrelated parallel machine scheduling problem
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
2010
- A comparison of priority rules for the job shop scheduling problem under different flow time- and tardiness-related objective functions
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- A hybrid job shop procedure for a Belgian manufacturing company producing industrial wheels and castors in rubber
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (2)
- A hybrid single and dual population search procedure for the job shop scheduling problem
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration 
See also Journal Article A hybrid single and dual population search procedure for the job shop scheduling problem, European Journal of Operational Research, Elsevier (2011) View citations (5) (2011)
- Comparing the accuracy of ABC and time-driven ABC in complex and dynamic environments: a simulation analysis
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- Introducing Learning Effects in Resource-constrained Project Scheduling
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
2009
- A Genetic Algorithm for the Nurse Rerostering Problem
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- A Genetic Algorithm for the Single Machine Maximum Lateness Problem
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- An Artificial Immune System for the Multi-Mode Resource-Constrained Project Scheduling Problem
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (4)
- Analyzing the Nursing Organizational Structure and Process from a Scheduling Perspective
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration 
See also Journal Article Analyzing the nursing organizational structure and process from a scheduling perspective, Health Care Management Science, Springer (2013) View citations (3) (2013)
- Introducing optimisation techniques to students: an exam case distribution model
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- Multi-mode resource constrained pro ject scheduling using RCPSP and SAT solvers
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (1)
See also Journal Article Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers, European Journal of Operational Research, Elsevier (2011) View citations (20) (2011)
- Reconstructing Nurse Schedules: Managerial Insights and Policy Decisions
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- Using Resource Scarceness Characteristics to Solve the Multi-Mode Resource-Constrained Project Scheduling Problem
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (2)
2008
- A Genetic Algorithm for the Multi-Mode Resource-Constrained Project Scheduling Problem
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (3)
- Automatic Personalized Crew Rostering at Brussels Airlines
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (1)
- Branching Strategies in a Branch-and-Price Approach for a Multiple Objective Nurse Scheduling Problem
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (10)
- Improved project time performance using activity sensitivity and network topology information
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- Integrating the Nurse Staffing Decision and the Shift Scheduling Decision: Case Study and Policy Analysis
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- The Impact of Incorporating Nurse-Specific Characteristics in a Cyclical Scheduling Approach
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (1)
See also Journal Article The impact of incorporating nurse-specific characteristics in a cyclical scheduling approach, Journal of the Operational Research Society, Palgrave Macmillan (2009) View citations (3) (2009)
- The effect of project schedule adherence and rework on the duration forecast accuracy of earned value metrics
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (1)
2007
- A Hybrid Scatter Search Heuristic for Personalized Crew Rostering in the Airline Industry
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (9)
See also Journal Article A hybrid scatter search heuristic for personalized crew rostering in the airline industry, European Journal of Operational Research, Elsevier (2010) View citations (20) (2010)
- A genetic algorithm to investigate the trade-off between project lead time and net present value
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration
- An electromagnetic time/cost trade-off optimization in project scheduling
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (1)
2006
- A Comparison and Hybridization of Crossover Operators for the Nurse Scheduling Problem
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (4)
See also Journal Article Comparison and hybridization of crossover operators for the nurse scheduling problem, Annals of Operations Research, Springer (2008) View citations (8) (2008)
- A finite capacity production scheduling procedure for a Belgian steel company
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration 
Also in Vlerick Leuven Gent Management School Working Paper Series, Vlerick Leuven Gent Management School (2006)
- A scatter search procedure for maximizing the net present value of a project under renewable resource constraints
Vlerick Leuven Gent Management School Working Paper Series, Vlerick Leuven Gent Management School 
Also in Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration (2006) View citations (1)
- An efficient hybrid search algorithm for various optimization problems
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (1)
- Meta-Heuristic resource constrained project scheduling: solution space restrictions and neighbourhood extensions
Vlerick Leuven Gent Management School Working Paper Series, Vlerick Leuven Gent Management School 
Also in Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration (2006)
- New computational results for the nurse scheduling problem: A scatter search algorithm
Vlerick Leuven Gent Management School Working Paper Series, Vlerick Leuven Gent Management School 
Also in Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration (2005) View citations (5)
- Pre-emptive resource-constrained project scheduling with setup times
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration 
Also in Vlerick Leuven Gent Management School Working Paper Series, Vlerick Leuven Gent Management School (2006)
- The impact of various activity assumptions on the lead-time and resource utilization of resource-constrained projects
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (8)
Also in Vlerick Leuven Gent Management School Working Paper Series, Vlerick Leuven Gent Management School (2006)
2005
- A Bi-Population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (4)
Also in Vlerick Leuven Gent Management School Working Paper Series, Vlerick Leuven Gent Management School (2005)
- A Comparison of Different Project Duration Forecasting Methods using Earned Value Metrics
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (28)
Also in Vlerick Leuven Gent Management School Working Paper Series, Vlerick Leuven Gent Management School (2005)
- A DECOMPOSITION-BASED HEURISTIC FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (17)
- A simulation analysis of interactions between errors in costing system design
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (27)
- A simulation and evaluation of earned value metrics to forecast the project duration
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (30)
See also Journal Article A simulation and evaluation of earned value metrics to forecast the project duration, Journal of the Operational Research Society, Palgrave Macmillan (2007) View citations (11) (2007)
- An Electromagnetic Meta-Heuristic for the Nurse Scheduling Problem
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (34)
- Characterisation and Generation of Nurse Scheduling Problem Instances
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (3)
- On the morphological structure of a network
Vlerick Leuven Gent Management School Working Paper Series, Vlerick Leuven Gent Management School 
Also in Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration (2004)
- THE DISCRETE TIME/COST TRADE-OFF PROBLEM UNDER VARIOUS ASSUMPTIONS EXACT AND HEURISTIC PROCEDURES
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (25)
2004
- A Hybrid Scatter Search / Electromagnetism Meta-Heuristic for Project Scheduling
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration 
Also in Vlerick Leuven Gent Management School Working Paper Series, Vlerick Leuven Gent Management School (2003) 
See also Journal Article A hybrid scatter search/electromagnetism meta-heuristic for project scheduling, European Journal of Operational Research, Elsevier (2006) View citations (25) (2006)
- AN ELECTROMAGNETISM META-HEURISTIC FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (4)
- WORK CONTINUITY CONSTRAINTS IN PROJECT SCHEDULING
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (5)
- WORK CONTINUITY IN A REAL-LIFE SCHEDULE: THE WESTERSCHELDE TUNNEL
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (1)
2003
- NEW COMPUTATIONAL RESULTS FOR THE DISCRETE TIME/COST TRADE-OFF PROBLEM WITH TIME-SWITCH CONSTRAINTS
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (5)
Also in Vlerick Leuven Gent Management School Working Paper Series, Vlerick Leuven Gent Management School (2002) 
See also Journal Article New computational results for the discrete time/cost trade-off problem with time-switch constraints, European Journal of Operational Research, Elsevier (2005) View citations (6) (2005)
2002
- OPTIMAL DUE DATE ASSIGNMENT IN PROJECT SCHEDULING
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium, Ghent University, Faculty of Economics and Business Administration View citations (3)
Also in Vlerick Leuven Gent Management School Working Paper Series, Vlerick Leuven Gent Management School (2002)
Journal Articles
2023
- A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem
European Journal of Operational Research, 2023, 307, (1), 1-19 View citations (2)
- A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem
European Journal of Operational Research, 2023, 306, (2), 579-595 View citations (3)
- Multi-project scheduling: A benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates
European Journal of Operational Research, 2023, 308, (1), 54-75 View citations (1)
2022
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty
Journal of Combinatorial Optimization, 2022, 43, (5), 1173-1202
- New summary measures and datasets for the multi-project scheduling problem
European Journal of Operational Research, 2022, 299, (3), 853-868 View citations (3)
- The bilevel optimisation of a multi-agent project scheduling and staffing problem
European Journal of Operational Research, 2022, 296, (1), 72-86
- Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control
European Journal of Operational Research, 2022, 297, (2), 451-466 View citations (1)
- Various extensions in resource-constrained project scheduling with alternative subgraphs
International Journal of Production Research, 2022, 60, (11), 3501-3520 View citations (1)
2021
- A new algorithm for resource-constrained project scheduling with breadth and depth of skills
European Journal of Operational Research, 2021, 292, (1), 43-59 View citations (4)
- Practical application of reference class forecasting for cost and time estimations: Identifying the properties of similarity
European Journal of Operational Research, 2021, 295, (3), 1161-1179 View citations (4)
- Using Schedule Risk Analysis with resource constraints for project control
European Journal of Operational Research, 2021, 288, (3), 736-752 View citations (3)
2020
- A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems
European Journal of Operational Research, 2020, 280, (3), 845-859 View citations (2)
- Mode generation rules to define activity flexibility for the integrated project staffing problem with discrete time/resource trade-offs
Annals of Operations Research, 2020, 292, (1), 133-160
- Project schedule performance under general mode implementation disruptions
European Journal of Operational Research, 2020, 280, (1), 295-311 View citations (1)
- Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling
Journal of Scheduling, 2020, 23, (3), 301-325 View citations (8)
- The impact of a limited budget on the corrective action taking process
European Journal of Operational Research, 2020, 286, (3), 1070-1086 View citations (3)
2019
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs
European Journal of Operational Research, 2019, 273, (3), 841-860 View citations (13)
- Strategies for project scheduling with alternative subgraphs under uncertainty: similar and dissimilar sets of schedules
European Journal of Operational Research, 2019, 279, (1), 38-53 View citations (5)
- The impact of applying effort to reduce activity variability on the project time and cost performance
European Journal of Operational Research, 2019, 277, (2), 442-453 View citations (5)
2018
- A perturbation matheuristic for the integrated personnel shift and task re-scheduling problem
European Journal of Operational Research, 2018, 269, (3), 806-823 View citations (4)
- Maximising the weighted number of activity execution modes in project planning
European Journal of Operational Research, 2018, 270, (3), 999-1013 View citations (1)
2017
- A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence
European Journal of Operational Research, 2017, 259, (3), 1097-1111 View citations (6)
- A buffer control method for top-down project control
European Journal of Operational Research, 2017, 262, (1), 274-286 View citations (3)
- A metaheuristic solution approach for the time-constrained project scheduling problem
OR Spectrum: Quantitative Approaches in Management, 2017, 39, (2), 353-371 View citations (4)
- A parallel multi-objective scatter search for optimising incentive contract design in projects
European Journal of Operational Research, 2017, 261, (3), 1066-1084 View citations (5)
- A resource type analysis of the integrated project scheduling and personnel staffing problem
Annals of Operations Research, 2017, 252, (2), 407-433 View citations (2)
- Capital- and resource-constrained project scheduling with net present value optimization
European Journal of Operational Research, 2017, 256, (3), 757-776 View citations (10)
- Optimised scheduling for weather sensitive offshore construction projects
Omega, 2017, 66, (PA), 58-78 View citations (10)
2016
- A scatter search for the extended resource renting problem
International Journal of Production Research, 2016, 54, (16), 4723-4743 View citations (1)
- An approach using SAT solvers for the RCPSP with logical constraints
European Journal of Operational Research, 2016, 249, (2), 577-591 View citations (8)
- Incentive contract design for projects: The owner׳s perspective
Omega, 2016, 62, (C), 93-114 View citations (3)
- On the use of multivariate regression methods for longest path calculations from earned value management observations
Omega, 2016, 61, (C), 127-140 View citations (3)
2015
- A new scheduling technique for the resource–constrained project scheduling problem with discounted cash flows
International Journal of Production Research, 2015, 53, (9), 2771-2786 View citations (5)
- Decomposition-based heuristics for the integrated physician rostering and surgery scheduling problem
Health Systems, 2015, 4, (3), 159-175
- On the design of custom packs: grouping of medical disposable items for surgeries
International Journal of Production Research, 2015, 53, (24), 7343-7359 View citations (2)
- Operating theatre modelling: integrating social measures
Journal of Simulation, 2015, 9, (2), 121-128
2014
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
European Journal of Operational Research, 2014, 235, (1), 62-72 View citations (31)
See also Working Paper An Experimental Investigation of Metaheuristics for the Multi-Mode Resource-Constrained Project Scheduling Problem on New Dataset Instances, Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium (2011) (2011)
- Setting tolerance limits for statistical project control using earned value management
Omega, 2014, 49, (C), 107-122 View citations (12)
2013
- An integrated nurse staffing and scheduling analysis for longer-term nursing staff allocation problems
Omega, 2013, 41, (2), 485-499 View citations (31)
- Analyzing the nursing organizational structure and process from a scheduling perspective
Health Care Management Science, 2013, 16, (3), 177-196 View citations (3)
See also Working Paper Analyzing the Nursing Organizational Structure and Process from a Scheduling Perspective, Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium (2009) (2009)
- Reconstructing nurse schedules: Computational insights in the problem size parameters
Omega, 2013, 41, (5), 903-918 View citations (6)
2011
- A hybrid single and dual population search procedure for the job shop scheduling problem
European Journal of Operational Research, 2011, 215, (3), 512-523 View citations (5)
See also Working Paper A hybrid single and dual population search procedure for the job shop scheduling problem, Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium (2010) (2010)
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
European Journal of Operational Research, 2011, 213, (1), 73-82 View citations (20)
See also Working Paper Multi-mode resource constrained pro ject scheduling using RCPSP and SAT solvers, Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium (2009) View citations (1) (2009)
- On the dynamic use of project performance and schedule risk information during projecttracking
Omega, 2011, 39, (4), 416-426 View citations (25)
2010
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
European Journal of Operational Research, 2010, 201, (2), 409-418 View citations (36)
- A hybrid scatter search heuristic for personalized crew rostering in the airline industry
European Journal of Operational Research, 2010, 206, (1), 155-167 View citations (20)
See also Working Paper A Hybrid Scatter Search Heuristic for Personalized Crew Rostering in the Airline Industry, Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium (2007) View citations (9) (2007)
- Using activity sensitivity and network topology information to monitor project time performance
Omega, 2010, 38, (5), 359-370 View citations (21)
2009
- On the characterization and generation of nurse scheduling problem instances
European Journal of Operational Research, 2009, 196, (2), 457-467 View citations (11)
- The impact of incorporating nurse-specific characteristics in a cyclical scheduling approach
Journal of the Operational Research Society, 2009, 60, (12), 1683-1698 View citations (3)
See also Working Paper The Impact of Incorporating Nurse-Specific Characteristics in a Cyclical Scheduling Approach, Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium (2008) View citations (1) (2008)
2008
- An evaluation of the adequacy of project network generators with systematically sampled networks
European Journal of Operational Research, 2008, 187, (2), 511-524 View citations (37)
- Comparison and hybridization of crossover operators for the nurse scheduling problem
Annals of Operations Research, 2008, 159, (1), 333-353 View citations (8)
See also Working Paper A Comparison and Hybridization of Crossover Operators for the Nurse Scheduling Problem, Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium (2006) View citations (4) (2006)
- Diversity in Resource Consumption Patterns and Robustness of Costing Systems to Errors
Management Science, 2008, 54, (10), 1715-1730 View citations (12)
2007
- A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem
Operations Research, 2007, 55, (3), 457-469 View citations (26)
- A simulation and evaluation of earned value metrics to forecast the project duration
Journal of the Operational Research Society, 2007, 58, (10), 1361-1374 View citations (11)
See also Working Paper A simulation and evaluation of earned value metrics to forecast the project duration, Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium (2005) View citations (30) (2005)
- Work Continuity Optimization for the Westerscheldetunnel Project in the Netherlands
Review of Business and Economic Literature, 2007, LII, (3), 435-450
2006
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
European Journal of Operational Research, 2006, 169, (2), 638-653 View citations (25)
See also Working Paper A Hybrid Scatter Search / Electromagnetism Meta-Heuristic for Project Scheduling, Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium (2004) (2004)
2005
- New computational results for the discrete time/cost trade-off problem with time-switch constraints
European Journal of Operational Research, 2005, 165, (2), 359-374 View citations (6)
See also Working Paper NEW COMPUTATIONAL RESULTS FOR THE DISCRETE TIME/COST TRADE-OFF PROBLEM WITH TIME-SWITCH CONSTRAINTS, Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium (2003) View citations (5) (2003)
2003
- Progress payments in project scheduling problems
European Journal of Operational Research, 2003, 148, (3), 604-620 View citations (8)
2002
- Discrete time/cost trade-offs in project scheduling with time-switch constraints
Journal of the Operational Research Society, 2002, 53, (7), 741-751 View citations (4)
2001
- An Exact Procedure for the Resource-Constrained Weighted Earliness–Tardiness Project Scheduling Problem
Annals of Operations Research, 2001, 102, (1), 179-196 View citations (7)
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
Management Science, 2001, 47, (8), 1113-1121 View citations (32)
Books
2018
- The Data-Driven Project Manager
Springer Books, Springer View citations (1)
2016
- Integrated Project Management Sourcebook
Springer Books, Springer View citations (1)
2014
- Integrated Project Management and Control
Management for Professionals, Springer View citations (5)
2013
- Project Management with Dynamic Scheduling
Springer Books, Springer View citations (4)
Also in Springer Books, Springer (2012) View citations (10)
2009
- Measuring Time
International Series in Operations Research and Management Science, Springer
Chapters
2015
- Generalized Discrete Time-Cost Tradeoff Problems
Springer
- Heuristic Methods for the Resource Availability Cost Problem
Springer View citations (2)
- The Multi-Mode Resource-Constrained Project Scheduling Problem
Springer View citations (1)
2014
- Conclusions
Springer
Also in Springer (2009) Springer (2012) Springer (2013)
- Earned Schedule
Springer
- Earned Value Management
Springer View citations (8)
Also in Springer (2012) View citations (1) Springer (2013)
- Forecasting
Springer
- P2 Engine
Springer
- ProTrack
Springer
- Project Data
Springer
- Schedule Adherence
Springer
- Schedule Control
Springer
- Schedule Risk
Springer
2013
- Advanced Topics
Springer
Also in Springer (2012)
- Critical Chain/Buffer Management
Springer
Also in Springer (2012)
- Dynamic Scheduling with ProTrack
Springer
Also in Springer (2012)
- Introduction
Springer
- Resource-Constrained Project Scheduling
Springer
Also in Springer (2012)
- Resource-Constrained Scheduling Extensions
Springer
Also in Springer (2012)
- Schedule Risk Analysis
Springer
Also in Springer (2012)
- The Critical Path Method
Springer
Also in Springer (2012)
- The Mutum-Paraná II Bridge Project (A)
Springer
Also in Springer (2012) Springer (2013) Springer (2013) Springer (2012) Springer (2012)
- The PERT/CPM Technique
Springer
Also in Springer (2012)
- The VMW Project
Springer
Also in Springer (2012)
- The Westerschelde Tunnel Project
Springer
Also in Springer (2012)
2012
- Introduction
Springer
2009
- A Case Study
Springer
- A Simulation Study
Springer
- Beyond the EVM Fundamentals
Springer
- ProTrack: A Software Tutorial
Springer
- The EVM Fundamentals
Springer
- Time Sensitivity
Springer
- Top-down or Bottom-up Project Tracking
Springer
|
The links between different versions of a paper are constructed automatically by matching on the titles.
Please contact if a link is incorrect.
Use this form
to add links between versions where the titles do not match.
|