EconPapers    
Economics at your fingertips  
 

P2 Engine

Mario Vanhoucke

Chapter Chapter 9 in Integrated Project Management and Control, 2014, pp 115-127 from Springer

Abstract: Abstract P2 Engine is an integrated project management and control utility tool developed by OR-AS. It is a command-line based application containing all algorithms of ProTrack that can be called using the LUA scripting language in order to generate gigabytes of project data. It generates project baseline scheduling data and risk analysis metrics as well as dynamic project progress data that can be used for testing and validating novel research ideas. P2 Engine is mainly used as a research tool for master students and PhD students at universities, but also acts as a support tool in consultancy projects to advance current business processes with extended dynamic scheduling features.

Keywords: Project Data; Project Schedule; Activity Duration; Previous Chapter; Project Portfolio (search for similar items in EconPapers)
Date: 2014
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-3-319-04331-9_9

Ordering information: This item can be ordered from
http://www.springer.com/9783319043319

DOI: 10.1007/978-3-319-04331-9_9

Access Statistics for this chapter

More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:mgmchp:978-3-319-04331-9_9