The impact of a limited budget on the corrective action taking process
Jie Song,
Annelies Martens and
Mario Vanhoucke
European Journal of Operational Research, 2020, vol. 286, issue 3, 1070-1086
Abstract:
The main goal of project control is to identify the deviations between the baseline schedule and the actual progress of the project by measuring the project performance in progress and using the project control methodologies to generate warning signals that act as triggers for corrective actions to bring the project back on track. To that purpose, tolerance limits are set on the required project performance, such that if the warning signals exceed these limits, they should result in appropriate corrective actions.
Keywords: Project management; Project control; Earned value management; Budget allocation; Simulation (search for similar items in EconPapers)
Date: 2020
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221720303027
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:286:y:2020:i:3:p:1070-1086
DOI: 10.1016/j.ejor.2020.03.069
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().