A Simulation Study

Mario Vanhoucke

Chapter Chapter 4 in Measuring Time, 2009, pp 51-86 from Springer

Abstract: Abstract This chapter presents two extensive simulation studies to test the relevance and accuracy of the concepts and metrics introduced in the previous chapters. The first simulation study has been set up to test the accuracy of the three duration methods (planned value method, earned duration method and earned schedule method) as presented in chapter 1 to predict the final duration of a project. The second simulation study tests the relevance of the schedule adherence concept (measured by the p-factor) as presented in chapter 2. The methodology used is Monte-Carlo simulation to generate activity duration and cost uncertainty in a project network. The literature on project network simulation is rich and widespread, and is praised as well as criticized throughout various research papers. In these simulation models, activity duration/cost variation is generated using often subjective probability distributions without precise accuracy in practical applications. However, the inability of the simulation runs to incorporate the management focus on a corrective action decision making process to bring late running projects back on track, has led to the crumbling credibility of these techniques. Despite the criticism, practitioners as well as academics have used project network models within a general simulation framework to enable the generation of activity duration and cost uncertainties. For a discussion on the (dis)advantages of project network simulation, the reader is referred toWilliams (1999). This issue will not be further discussed in this book.

Keywords: Mean Absolute Percentage Error; Forecast Accuracy; Project Schedule; Precedence Relation; Project Network (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:isochp:978-1-4419-1014-1_4

Ordering information: This item can be ordered from
http://www.springer.com/9781441910141

DOI: 10.1007/978-1-4419-1014-1_4

Access Statistics for this chapter

More chapters in International Series in Operations Research & Management Science from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:isochp:978-1-4419-1014-1_4