Introduction

Mario Vanhoucke

Chapter Chapter 1 in Project Management with Dynamic Scheduling, 2013, pp 1-8 from Springer

Abstract: Abstract This chapter gives a short introduction to the central theme of the book and highlights the three components of dynamic project scheduling: the construction of a project baseline schedule, a risk analysis of this schedule and the project’s performance measurement and control component. The chapter also gives a short introduction to the project life cycle to provide a guidance to the various chapters of the book. A simple and intuitive project mapping approach is briefly described and will be used to put all techniques discussed throughout the various chapters into perspective.

Keywords: Dynamic Project Scheduling; Baseline Schedule; Project Life Cycle (PLC); Project Control Phase; Schedule Risk Analysis (SRA) (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-40438-2_1

Ordering information: This item can be ordered from
http://www.springer.com/9783642404382

DOI: 10.1007/978-3-642-40438-2_1

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-23
Handle: RePEc:spr:sprchp:978-3-642-40438-2_1