Earned Schedule

Mario Vanhoucke

Chapter Chapter 3 in Integrated Project Management and Control, 2014, pp 33-40 from Springer

Abstract: Abstract The two time performance metrics presented in the previous chapter, known as the Schedule Variance (SV) and the Schedule Performance Index (SPI), have known shortcomings and exhibit unreliable trends from the middle to late project stages. These shortcomings have led to the development of a simple alternative, known as the Earned Schedule (ES) method. This method makes use of the traditional EVM key metrics, and can therefore be seen as an extension and/or improvement to the current traditional time performance metrics rather than a newly designed technique.

Keywords: Earned Schedule (ES); Schedule Performance Index (SPI); Time Performance Metrics; Unreliable Trend; Late Stage Projects (search for similar items in EconPapers)
Date: 2014
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-3-319-04331-9_3

Ordering information: This item can be ordered from
http://www.springer.com/9783319043319

DOI: 10.1007/978-3-319-04331-9_3

Access Statistics for this chapter

More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-05-18
Handle: RePEc:spr:mgmchp:978-3-319-04331-9_3