Mario Vanhoucke

Chapter Chapter 8 in Integrated Project Management and Control, 2014, pp 105-114 from Springer

Abstract: Abstract ProTrack is an acronym for Project Tracking, which is a synonym for project control. It has been developed as an integrated project management and control software tool based on research done at the Operations Research and Scheduling (OR&S) research group of Ghent University. The integration between baseline scheduling and risk analysis to facilitate and improve project control lies at the heart of ProTrack. The integrated project management and control theme of this book has been largely inspired by numerous research and consultancy projects that have finally resulted in the development of the first ProTrack version.

Keywords: ProTrack; Baseline Schedule; Integrated Project Management; Project Control Methods; Schedule Risk Analysis (SRA) (search for similar items in EconPapers)
Date: 2014
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-3-319-04331-9_8

Ordering information: This item can be ordered from
http://www.springer.com/9783319043319

DOI: 10.1007/978-3-319-04331-9_8

Access Statistics for this chapter

More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:mgmchp:978-3-319-04331-9_8