Introduction
Mario Vanhoucke
Chapter Chapter 1 in Project Management with Dynamic Scheduling, 2012, pp 1-8 from Springer
Abstract:
Abstract This chapter gives a short introduction to the central theme of the book and highlights the three components of dynamic project scheduling: the construction of a project baseline schedule, a risk analysis of this schedule and the project’s performance measurement and control component. The chapter also gives a short introduction to the project life cycle to provide a guidance to the various chapters of the book. A simple and intuitive project mapping approach is briefly described and will be used to put all techniques discussed throughout the various chapters into perspective.
Keywords: Dynamic Project Scheduling; Baseline Schedule; Project Life Cycle (PLC); Project Control Phase; Schedule Risk Analysis (SRA) (search for similar items in EconPapers)
Date: 2012
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-25175-7_1
Ordering information: This item can be ordered from
http://www.springer.com/9783642251757
DOI: 10.1007/978-3-642-25175-7_1
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla (sonal.shukla@springer.com) and Springer Nature Abstracting and Indexing (indexing@springernature.com).