Advanced Topics
Mario Vanhoucke
Chapter Chapter 13 in Project Management with Dynamic Scheduling, 2012, pp 239-258 from Springer
Abstract:
Abstract This chapter gives an overview of the main Earned Value Management (EVM) research results obtained by a large Monte-Carlo simulation study summarized in the book by Vanhoucke (2010a). The focus is on the prediction of the final duration of a project in progress using the forecasting methods of Sect. 12.4.1. The chapter measures the accuracy of these prediction methods and the main drivers of this accuracy along the various stages in the project life cycle. The chapter also presents a rather new EVM extension, the so-called p-factor approach, to measure schedule adherence based on the traditional earned value metrics. Finally, the chapter presents the main results of integrating the three components of dynamic scheduling (baseline scheduling, risk analysis and project control) and investigates whether the integrated approach might lead to a higher efficiency of the project control phase during its progress.
Keywords: Forecast Accuracy; Project Schedule; Dynamic Schedule; Project Network; Project Control (search for similar items in EconPapers)
Date: 2012
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
Chapter: Advanced Topics (2013)
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-25175-7_13
Ordering information: This item can be ordered from
http://www.springer.com/9783642251757
DOI: 10.1007/978-3-642-25175-7_13
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().