The bilevel optimisation of a multi-agent project scheduling and staffing problem

P. Milička, P. Šůcha, Mario Vanhoucke and B. Maenhout

European Journal of Operational Research, 2022, vol. 296, issue 1, 72-86

Abstract: In this paper, we study a multi-agent project staffing problem involving a single project, which has to be scheduled under resource constraints. We consider a functional organisational structure where a team leader and a project manager are together responsible for the operational execution of a project. The team leader, which has the formal authority over the resources, is standing at the top of the hierarchy and determines the number and mix of (additional) employees and tries to level the workload over the planning period in order to avoid idle resource times. The project manager is responsible for the scheduling of the project activities and his/her objective is to minimise the project duration. The interaction between both agents in the decision-making process is, on the one hand, hierarchical, i.e. the team leader imposes his/her decision on the project manager. On the other hand, the decision taken by the team leader should comply to the objective of the project manager such that the staffing plan and project schedule is agreed by both parties. We propose a bilevel optimisation model that embeds a nested inner optimisation problem, i.e. the project manager decision problem, as a constraint in the outer optimisation problem, i.e. the decision problem of the team leader. The algorithm is a mathematical programming method thriving on the generation of additional lazy constraints via feasibility callbacks so that the team leader problem has to respect the requirements formulated in the project manager problem. In the computational experiments, we compare this solution approach to alternative classical optimisation approaches and we validate the design choices related to the proposed speed-up mechanisms and parameter settings.

Keywords: Project scheduling; Personnel staffing; Multi-agent; Bilevel optimisation (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S037722172100254X
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:296:y:2022:i:1:p:72-86

DOI: 10.1016/j.ejor.2021.03.028

Access Statistics for this article

European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati

More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:ejores:v:296:y:2022:i:1:p:72-86