A buffer control method for top-down project control
Annelies Martens and
Mario Vanhoucke
European Journal of Operational Research, 2017, vol. 262, issue 1, 274-286
Abstract:
Timely completion of projects is an important factor for project success. However, projects often exceed their predefined deadline, which results in a late project delivery and an increase in the total project cost. In order to increase the probability of timely completion, a project buffer can be planned at the end of a project. During project execution, an assessment of the total buffer consumption at the project completion date can be made in order to periodically monitor the project progress. When the expected buffer consumption is higher than 100%, the project deadline is expected to be exceeded and the project manager should take corrective actions to get the project back on track.
Keywords: Project management; Schedule control; Earned value management (EVM); Simulation; Project buffer (search for similar items in EconPapers)
Date: 2017
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0377221717302382
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ejores:v:262:y:2017:i:1:p:274-286
DOI: 10.1016/j.ejor.2017.03.034
Access Statistics for this article
European Journal of Operational Research is currently edited by Roman Slowinski, Jesus Artalejo, Jean-Charles. Billaut, Robert Dyson and Lorenzo Peccati
More articles in European Journal of Operational Research from Elsevier
Bibliographic data for series maintained by Catherine Liu ().