The Critical Path Method

Mario Vanhoucke

Chapter Chapter 3 in Project Management with Dynamic Scheduling, 2012, pp 37-56 from Springer

Abstract: Abstract This chapter makes an effort to tighten the gap between the project scheduling literature and the needs of project managers and schedulers through the use of a practical computerized simulation game. Project managers are constantly confronted with the intricacy of scheduling a complex real-life problem in an efficient way when they often have little knowledge of the state-of-the-art in the algorithmic developments or inherent characteristics of the scheduling problem they solve. A game has been developed that serves as a training tool to help practitioners gain insight in project scheduling. The well-known critical path method (CPM) with activity time/cost trade-offs is introduced to the reader, and used as a project scheduling technique in the game.

Keywords: Critical Path Method (CPM); Project Scheduling; Crash Duration (CD); Discrete Time-cost Tradeoff Problem (DTCTP); Target Deadline (search for similar items in EconPapers)
Date: 2012
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
Chapter: The Critical Path Method (2013)
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-25175-7_3

Ordering information: This item can be ordered from
http://www.springer.com/9783642251757

DOI: 10.1007/978-3-642-25175-7_3

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-02
Handle: RePEc:spr:sprchp:978-3-642-25175-7_3