The Westerschelde Tunnel Project

Mario Vanhoucke

Chapter Chapter 9 in Project Management with Dynamic Scheduling, 2013, pp 175-185 from Springer

Abstract: Abstract This chapter presents a real-life project example where the minimization of a bottleneck resource’s idle time is the scheduling objective. The project is an illustration of a project scheduling problem with a work continuity scheduling objective as discussed in Sect. 8.2.1. The chapter illustrates that the use of dedicated scheduling algorithms can lead to improvements in the cost outline of the schedule. Various parts of this chapter have been published in Vanhoucke (2006b, 2007).

Keywords: Idle Time; Construction Project; Project Schedule; Precedence Relation; Project Schedule Problem (search for similar items in EconPapers)
Date: 2013
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
Chapter: The Westerschelde Tunnel Project (2012)
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-40438-2_9

Ordering information: This item can be ordered from
http://www.springer.com/9783642404382

DOI: 10.1007/978-3-642-40438-2_9

Access Statistics for this chapter

More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-23
Handle: RePEc:spr:sprchp:978-3-642-40438-2_9