EconPapers    
Economics at your fingertips  
 

Lean strategies for scheduled maintenance operations

Christopher B. Chandler, Malini Natarajarathinam, Wei Lu and Aparajit Koshal

International Journal of Business Excellence, 2020, vol. 22, issue 3, 379-395

Abstract: As the E-6B airframe ages, it is becoming increasingly difficult to maintain the minimum requirements for fleet ready for tasking (RFT) aircraft assets. The research conducted in this project has the primary focus of finding solutions to this problem that will ultimately increase the number of RFT aircraft in the E-6B community. The E-6B operates in support of United States Strategic Command, providing a survivable airborne nuclear communication platform in support of nuclear deterrence. This paper evaluates lean strategies in relation to the scheduled maintenance program of the E-6B and details the results of a manpower study and potential manpower solution utilising lean principles with relation to manpower.

Keywords: phase inspection; manpower management; manpower utilisation; ready for tasking; RFT; process improvement; human capital; lean production; creating value; lean scheduled maintenance. (search for similar items in EconPapers)
Date: 2020
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.inderscience.com/link.php?id=110962 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:ids:ijbexc:v:22:y:2020:i:3:p:379-395

Access Statistics for this article

More articles in International Journal of Business Excellence from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().

 
Page updated 2025-03-19
Handle: RePEc:ids:ijbexc:v:22:y:2020:i:3:p:379-395