Jordanian contractors' human resource capabilities: a survey
Ghaleb Y. Abbasi and
Jamal M. Assbeihat
International Journal of Human Resources Development and Management, 2006, vol. 6, issue 1, 131-139
Abstract:
The Jordanian contracting construction industry has been ignored, although it is a very important sector that affects the economic status of the country. This paper aims to investigate the contractors' administrative and technical human resource capabilities in Jordan in terms of number, qualification, and experience during the project implementation phase. A random sample from the highest three grades of classified contractors was surveyed to determine if there are sufficient levels to meet the required demand, and determine the relationship between the three-grade classification and the utilisation level using several statistical tools. Findings have demonstrated that sufficient levels exist. No significant differences have been found in most of the parameters of the study according to the contractors' three grade classification. Hence, aside from the grade classification, a new criterion is required, at least during the project awarding.
Keywords: contracting; construction industry; human resources; technical staff; administrative staff; Jordan. (search for similar items in EconPapers)
Date: 2006
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.inderscience.com/link.php?id=9753 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ids:ijhrdm:v:6:y:2006:i:1:p:131-139
Access Statistics for this article
More articles in International Journal of Human Resources Development and Management from Inderscience Enterprises Ltd
Bibliographic data for series maintained by Sarah Parker ().