EconPapers    
Economics at your fingertips  
 

Consistent Application of Risk Management for Selection of Engineering Design Options in Mega-Projects

Yuri Raydugin
Additional contact information
Yuri Raydugin: Risk Services & Solutions Inc., Calgary, AB, Canada

International Journal of Risk and Contingency Management (IJRCM), 2012, vol. 1, issue 4, 44-55

Abstract: Traditional application of project risk management is limited to identifying and addressing project risks and then developing cost along with schedule contingencies. This paper proposes a method to consistently utilize the project risk management methods during Front End Engineering Design (FEED) phase of project development to select engineering design options. This method was called for recently to make several key engineering design decisions in a mega-project (case study). It allows significantly accelerate decision making and successfully manage various types of bias through leveraging the structure and visualization it provides. The proposed method is also applicable for engineering change management in any phase including operations.

Date: 2012
References: Add references at CitEc
Citations:

Downloads: (external link)
http://services.igi-global.com/resolvedoi/resolve. ... 018/ijrcm.2012100104 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:igg:jrcm00:v:1:y:2012:i:4:p:44-55

Access Statistics for this article

International Journal of Risk and Contingency Management (IJRCM) is currently edited by Narasimha Rao Vajjhala

More articles in International Journal of Risk and Contingency Management (IJRCM) from IGI Global
Bibliographic data for series maintained by Journal Editor ().

 
Page updated 2025-03-19
Handle: RePEc:igg:jrcm00:v:1:y:2012:i:4:p:44-55