EconPapers    
Economics at your fingertips  
 

Integrated Production, Inventory and Delivery Problems: Complexity and Algorithms

Feng Li (), Zhi-Long Chen () and Zhi-Long Chen ()
Additional contact information
Feng Li: Institute of Industrial Engineering and Logistics Optimization, Northeastern University, Shenyang, 110819, China
Zhi-Long Chen: Robert H. Smith School of Business, University of Maryland, College Park, Maryland 20742
Zhi-Long Chen: Institute of Industrial Engineering and Logistics Optimization, Northeastern University, Shenyang, 110819, China

INFORMS Journal on Computing, 2017, vol. 29, issue 2, 232-250

Abstract: We consider several integrated production, inventory, and delivery problems that arise in a number of practical settings where customer orders have pre-specified delivery time windows. These orders are first processed in a plant and then delivered to the customers by transporters (such as trains and air flights) which have fixed delivery departure times. If an order is completed but not immediately delivered by a transporter, the order is kept temporarily in inventory, which incurs an inventory cost. There is a delivery cost for delivering an order, which varies with the departure time. Given a set of orders, the objective is to find an integrated schedule for processing the orders, keeping finished orders in inventory if necessary, and delivering them to the customers such that the total inventory and delivery cost is minimum. We consider two classes of problems: where order delivery is splittable and where order delivery is nonsplittable. For each of the problems considered, we study its computational complexity by either showing that the problem is NP-hard or proposing an algorithm that can find an optimal solution. For the two most general problems, we show that any polynomial time algorithm has an arbitrarily bad worst-case performance bound, and propose combined column generation and tabu search heuristic algorithms that can find near optimal solutions for them in a reasonable computational time.

Keywords: integrated production; inventory and delivery; scheduling; fixed departure times; delivery time windows; computational complexity; dynamic programming; column generation; tabu search; heuristics (search for similar items in EconPapers)
Date: 2017
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (12)

Downloads: (external link)
https://doi.org/10.1287/ijoc.2016.0726 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:orijoc:v:29:y:2017:i:2:p:232-250

Access Statistics for this article

More articles in INFORMS Journal on Computing from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:orijoc:v:29:y:2017:i:2:p:232-250