Robust Capacity Planning for Project Management

Antonio J. Conejo (), Nicholas G. Hall (), Daniel Zhuoyu Long () and Runhao Zhang ()
Additional contact information
Antonio J. Conejo: Department of Integrated Systems Engineering, The Ohio State University, Columbus, Ohio 43210
Nicholas G. Hall: Department of Management Sciences, The Ohio State University, Columbus, Ohio 43210
Daniel Zhuoyu Long: Department of Systems Engineering and Engineering Management, The Chinese University of Hong Kong, Shatin, Hong Kong
Runhao Zhang: Department of Systems Engineering and Engineering Management, The Chinese University of Hong Kong, Shatin, Hong Kong

INFORMS Journal on Computing, 2021, vol. 33, issue 4, 1533-1550

Abstract: We consider a significant problem that arises in the planning of many projects. Project companies often use outsourced providers that require capacity reservations that must be contracted before task durations are realized. We model these decisions for a company that, given partially characterized distributional information, assumes the worst-case distribution for task durations. Once task durations are realized, the project company makes decisions about fast tracking and outsourced crashing, to minimize the total capacity reservation, fast tracking, crashing, and makespan penalty costs. We model the company’s objective using the target-based measure of minimizing an underperformance riskiness index. We allow for correlation in task performance, and for piecewise linear costs of crashing and makespan penalties. An optimal solution of the discrete, nonlinear model is possible for small to medium size projects. We compare the performance of our model against the best available benchmarks from the robust optimization literature, and show that it provides lower risk and greater robustness to distributional information. Our work thus enables more effective risk minimization in projects, and provides insights about how to make more robust capacity reservation decisions. Summary of Contribution: This work studies a financially significant planning problem that arises in project management. Companies that face uncertainties in project execution may need to reserve capacity with outsourced providers. Given that decision, they further need to plan their operational decisions to protect against a bad outcome. We model and solve this problem via adjustable distributionally robust optimization. While this problem involves two-stage decision making, which is computationally challenging in general, we develop a computationally efficient algorithm to find the exact optimal solution for instances of practical size.

Keywords: project management; capacity reservation; adjustable distributionally robust optimization; optimal algorithm (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://dx.doi.org/10.1287/ijoc.2020.1033 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:orijoc:v:33:y:2021:i:4:p:1533-1550

Access Statistics for this article

More articles in INFORMS Journal on Computing from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-04-17
Handle: RePEc:inm:orijoc:v:33:y:2021:i:4:p:1533-1550