The Effect of Coordination and Uncertainty on Software Project Performance: Residual Performance Risk as an Intervening Variable

Sarma Nidumolu
Additional contact information
Sarma Nidumolu: MIS Department, College of Business and Public Administration, University of Arizona, Tucson, AZ 85721

Information Systems Research, 1995, vol. 6, issue 3, 191-219

Abstract: In this research, a study of the effects of coordination mechanisms and risk drivers such as project uncertainty on the performance of software development projects was conducted. Two types of coordination mechanisms were considered: vertical and horizontal. The former refers to the extent to which coordination between users and IS staff is undertaken by authorized entities such as project managers or steering committees. The latter refers to the extent to which coordination is undertaken through mutual adjustments and communications between users and IS staff. A new research model was developed by synthesizing research using the structural contingency perspective from Organization Theory and the risk-based perspective in Software Engineering. The model suggests that residual performance risk, i.e., the difficulty in estimating performance-related outcomes during the later stages of the project, can clarify the relationship between project uncertainty, coordination mechanisms and performance. Eight hypotheses were derived from the model for empirical testing. Data were collected from 64 software development projects in the banking and other industries. The results provide considerable support for a revised research model. As expected, project uncertainty increases residual performance risk. Both in turn have a direct negative effect on performance. Vertical coordination significantly reduces both project uncertainty and residual performance risk. However, horizontal coordination does not have any significant effect on residual performance risk. Instead, it has a direct positive effect on project performance. Moreover, higher levels of both vertical and horizontal coordination lead to higher levels of overall performance. Their differential impacts on residual performance risk are interesting areas of future research.

Keywords: performance risk; project uncertainty; vertical coordination; horizontal coordination; project performance (search for similar items in EconPapers)
Date: 1995
References: Add references at CitEc
Citations: View citations in EconPapers (31)

Downloads: (external link)
http://dx.doi.org/10.1287/isre.6.3.191 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:orisre:v:6:y:1995:i:3:p:191-219

Access Statistics for this article

More articles in Information Systems Research from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:orisre:v:6:y:1995:i:3:p:191-219