Resource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions
E. B. Berman
Additional contact information
E. B. Berman: Consultant, Research Analysis Corporation and Institute for Defense Analysis
Management Science, 1964, vol. 10, issue 4, 734-745
Abstract:
This paper describes a conceptual model which allocates resources in a PERT network, the activities of which are subject to continuous concave-upward time-cost functions, in such a way as to achieve a minimum cost solution for a given completion date for the program described by the network. A parametric solution for the minimum cost solution at various total program times is also briefly described. The effect of uncertainty in the time of completion of an activity has also been investigated in a highly simplified model; and a tentative conclusion is presented that such uncertainty tends to divert resources toward the earlier part of the program, as compared to the solution under certainty.
Date: 1964
References: Add references at CitEc
Citations: View citations in EconPapers (15)
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.10.4.734 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:10:y:1964:i:4:p:734-745
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().