On the Expected Duration of PERT Type Networks

Salah E. Elmaghraby
Additional contact information
Salah E. Elmaghraby: Yale University

Management Science, 1967, vol. 13, issue 5, 299-306

Abstract: In PERT-type networks, where activity times are random variables, the expected duration of the total project can be approximated by first substituting the expected values of the individual activities, and then evaluating the length of the critical path. This paper develops two improved estimates. Both estimates approach the true expected duration from below, i.e., they are both optimistic estimates.

Date: 1967
References: Add references at CitEc
Citations: View citations in EconPapers (14)

Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.13.5.299 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:13:y:1967:i:5:p:299-306

Access Statistics for this article

More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:ormnsc:v:13:y:1967:i:5:p:299-306