Blast Furnace Production Planning--A Linear Programming Example
Tibor Fabian
Management Science, 1967, vol. 14, issue 2, B1-B27
Abstract:
A description of the blast furnace production process is presented and the thermochemical metallurigcal process is expressed as a set of constraints of a linear programming problem. The solution indicates a minimum cost selection of input materials in a production planning context. The material presented here is dedicated to those who are engaged in the mathematical modelling of chemical and other complex processes for purposes of management control. It is also hoped that by adding the paper to the literature of detailed examples, a case study, often desired for classroom instruction, will be provided to educators.
Date: 1967
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.14.2.B1 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:14:y:1967:i:2:p:b1-b27
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().