Heuristic Scheduling in a Woolen Mill
E. Gerald Hurst, Jr. and
Aidan B. McNamara
Additional contact information
E. Gerald Hurst, Jr.: General Electric Company, Philadelphia
Aidan B. McNamara: Institute for Industrial Research and Standards, Dublin, Ireland
Management Science, 1967, vol. 14, issue 4, B182-B203
Abstract:
The scheduling procedure of a particular production planner in a woolen mill is investigated. A model is developed which attempts to describe the planner's average behavior. Schedules are generated by this model and are compared with the corresponding schedules of the planner. Discrepancies between the planner's and the model's schedules are interpreted with respect to both the adequacy of the model and the consistency of the planner. Suggestions are made for application of the technique to real-time scheduling.
Date: 1967
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.14.4.B182 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:14:y:1967:i:4:p:b182-b203
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().