Communication to the Editor--The Use of Subjective Probability Estimates in Assessing Project Completion Times
J. B. Kidd and
J. R. Morgan
Additional contact information
J. B. Kidd: Departmental of Engineering Production, University of Birmingham
J. R. Morgan: Institute for Operational Research
Management Science, 1969, vol. 16, issue 3, 266-269
Abstract:
The conclusion from this analysis supports King's [King, W. R., T. A. Wilson. 1967. Subjective time estimates in critical path planning--A preliminary analysis. Management Sci. 13(5, January) 307-320.] main point that there is little evidence of learning (i.e. improvement in the accuracy of estimates) in the period before work starts. There are, however, some differences. In this situation, more changes in estimates are made before work starts than reported by King. This is perhaps not surprising since King's analysis refers to new construction, which can perhaps be specified more clearly in advance, rather than the maintenance work which we are concerned.
Date: 1969
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.16.3.266 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:16:y:1969:i:3:p:266-269
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().