EconPapers    
Economics at your fingertips  
 

The Influence of Setup Time on Job Shop Performance

Jon K. Wilbrecht and William B. Prescott
Additional contact information
Jon K. Wilbrecht: Sylvania Electronic Systems
William B. Prescott: Autonetics Division of North American Rockwell

Management Science, 1969, vol. 16, issue 4, B274-B280

Abstract: A job shop was simulated in order to determine the effect of different job priority rules involving setup times on shop performance. The seven priority rules tested were chosen on the basis that they could be implemented by job shop foremen. Assumptions in the simulation model were based on experience with an electronics company and published literature. The study indicates that, for a fully loaded shop, giving priority to be the job with the shortest actual setup time, regardless of its run time, gives the best overall performance result.

Date: 1969
References: Add references at CitEc
Citations: View citations in EconPapers (14)

Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.16.4.B274 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:16:y:1969:i:4:p:b274-b280

Access Statistics for this article

More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:ormnsc:v:16:y:1969:i:4:p:b274-b280