The Influence of Setup Time on Job Shop Performance
Jon K. Wilbrecht and
William B. Prescott
Additional contact information
Jon K. Wilbrecht: Sylvania Electronic Systems
William B. Prescott: Autonetics Division of North American Rockwell
Management Science, 1969, vol. 16, issue 4, B274-B280
Abstract:
A job shop was simulated in order to determine the effect of different job priority rules involving setup times on shop performance. The seven priority rules tested were chosen on the basis that they could be implemented by job shop foremen. Assumptions in the simulation model were based on experience with an electronics company and published literature. The study indicates that, for a fully loaded shop, giving priority to be the job with the shortest actual setup time, regardless of its run time, gives the best overall performance result.
Date: 1969
References: Add references at CitEc
Citations: View citations in EconPapers (14)
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.16.4.B274 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:16:y:1969:i:4:p:b274-b280
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().