EconPapers    
Economics at your fingertips  
 

Addendum to Stankard and Gupta's Note on Lot Size Scheduling

Thom J. Hodgson
Additional contact information
Thom J. Hodgson: Industrial Engineering Department, The University of Michigan

Management Science, 1970, vol. 16, issue 7, 514-517

Abstract: This paper presents a grouping procedure which yields improved solutions to Bomberger's Lot Size Scheduling Problem [1]. The group definition is a generalization of the group definition proposed by Stankard and Gupta [3]. Moreover, the generalization leads to a pseudo dynamic programming procedure which is readily programmable. Computational experience has shown the procedure to be extremely efficient.

Date: 1970
References: Add references at CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.16.7.514 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:16:y:1970:i:7:p:514-517

Access Statistics for this article

More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:ormnsc:v:16:y:1970:i:7:p:514-517