EconPapers    
Economics at your fingertips  
 

Critical Path Problems with Concave Cost-Time Curves

James E. Falk and Joel L. Horowitz
Additional contact information
James E. Falk: The George Washington University
Joel L. Horowitz: The Environmental Protection Agency, Washington, D.C.

Management Science, 1972, vol. 19, issue 4-Part-1, 446-455

Abstract: This paper presents an algorithm for determining the minimum cost schedule of tasks in a critical path network in which task cost-time curves may be concave. A computer program for the case of cost-time curves that are piecewise linear in two segments is described, and a numerical example is presented.

Date: 1972
References: Add references at CitEc
Citations: View citations in EconPapers (20)

Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.19.4.446 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:19:y:1972:i:4-part-1:p:446-455

Access Statistics for this article

More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:ormnsc:v:19:y:1972:i:4-part-1:p:446-455