Optimal Use of Control Charts for Controlling Current Production
Shaul P. Ladany
Additional contact information
Shaul P. Ladany: Tel-Aviv University
Management Science, 1973, vol. 19, issue 7, 763-772
Abstract:
A model is developed consisting of all the costs incurred when fraction-defective control charts are utilized to control current production: cost of sampling, cost of not detecting a change in the process, cost of false indication of change, and cost of re-adjusting detected changes. It is suggested that such control charts can be utilized in an optimal way, if those combinations of sample size, frequency of sampling and extent of control limits from process average will be used that provide the minimum total cost. It is further suggested that, by applying any specific cost data to this model, these optimal decision values can be easily evaluated by computer enumeration.
Date: 1973
References: Add references at CitEc
Citations: View citations in EconPapers (8)
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.19.7.763 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:19:y:1973:i:7:p:763-772
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().