Linear Programming under Uncertainty

George B. Dantzig
Additional contact information
George B. Dantzig: The Rand Corporation, Santa Monica, California

Management Science, 1955, vol. 1, issue 3-4, 197-206

Abstract: The essential character of the general models under consideration is that activities are divided into two or more stages. The quantities of activities in the first stage are the only ones that are required to be determined; those in the second (or later) stages can not be determined in advance since they depend on the earlier stages and the random or uncertain demands which occur on or before the latter stage. It is important to note that the set of activities are assumed to be complete in the sense that, whatever be the choice of activities in the earlier stages (consistent with the restrictions applicable to their stage), there is a possible choice of activities in the latter stages. In other words it is not possible to get in a position where the programming problem admits of no solution.

Date: 1955
References: Add references at CitEc
Citations: View citations in EconPapers (180)

Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.1.3-4.197 (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:1:y:1955:i:3-4:p:197-206

Access Statistics for this article

More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().

 
Page updated 2025-03-19
Handle: RePEc:inm:ormnsc:v:1:y:1955:i:3-4:p:197-206