Précis--Assessment of Airframe Production Cost Risk
John A. Finchum, Jr.
Additional contact information
John A. Finchum, Jr.: Standard Oil Company, Indiana
Management Science, 1974, vol. 21, issue 2, 237-237
Abstract:
Cost growth of weapon systems is a major concern of the DOD and its contractors. Almost half of the cost overrun on major weapon systems during the late 1960's and early 1970's was due to refinement of original cost estimates for reasons other than changes in performance, economic conditions, engineering and construction scheduling. A fruitful area to which to apply cost risk assessment techniques is the air-frame production cost during the proposal stage of an aircraft.
Date: 1974
References: Add references at CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.21.2.237 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:21:y:1974:i:2:p:237-237
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().