Multi-Item Lot Size Scheduling by Heuristic Part II: With Variable Resources
E. F. Peter Newson
Additional contact information
E. F. Peter Newson: The University of Western Ontario
Management Science, 1975, vol. 21, issue 10, 1194-1203
Abstract:
In Part II, the CLSP Heuristic of Part I is extended to include variable capacity constraints--in this case the ability to adjust workforce levels and to employ overtime. The paper concludes with computational results for both the fixed and variable capacity heuristics.
Date: 1975
References: Add references at CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.21.10.1194 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:21:y:1975:i:10:p:1194-1203
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().